Axminster AWFS18 Provozní pokyny Strana 7

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 24
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 6
Initial Assembly
07
Fig 1
Fig 2
Undo the two grub screws
Fig 3
Slide on the blade guard and lightly
tighten the butterfly bolt
Slide the angle support rod through the two
pre-drilled holes & tighten the grub screws
Angle support rod
Grub screws
Cast iron blocks
3mm Hex key
Fig 4
REMOVE the two hex bolts in readiness for
mounting the NVR assembly
Hex bolts
E
D
Mounting the NVR Switch Assembly:
The NVR switch is mounted to a steel angle bracket
(B),to the base of the bracket there are three pre-drilled
holes, two of the holes are for fixing the assembly to
the fretsaw arm while the third is for securing the air
delivery tube (C). You will require a 5mm Hex key and
a 17mm spanner. Please follow the instruction below.
1) Loosen and remove the two hex bolts from the cast
iron arm. (See fig 4).
NOTE: Support the arm to stop it from dropping
onto the table.
2) Line up the two holes in the NVR switch bracket with
the pre-drilled holes in the cast iron arm and secure
using the two hex bolts you removed earlier. (See figs 5
& 6 on the next page) (DO NOT OVER TIGHTEN)
NOTE: You may need to remove the cable covers on
the NVR switch to enable a 5mm allen key to gain
access to secure the hex bolts.
Zobrazit stránku 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 23 24

Komentáře k této Příručce

Žádné komentáře